Extension electrical work in Southport covers everything from first fix cabling to final testing in new extensions and loft conversions. We work with your builder and provide the certificate building control needs.

The best time to involve an electrician is before the walls are boarded. We run cables while the timber frame and ceiling are open, which is quicker and neater than chasing walls later. Talking to your builder early also means sockets and lights end up exactly where you want them.
An extension often adds a kitchen, a bathroom or underfloor heating, which puts extra load on your supply. We check whether your consumer unit has space and suitable protection for new circuits. If not, we explain the options before the build gets too far.
Building control will want to see an Electrical Installation Certificate before they sign off the extension. They may also ask for mains-powered smoke alarms. As a NAPIT approved electrician, we register the electrical work for you, which keeps the completion certificate on track.
We look at the drawings and walk the site with you and your builder to agree the layout of sockets, lighting, heating controls and outdoor lights. We also check the existing installation and consumer unit, then give you a free quote for the full electrical package.
First fix happens once the frame and roof are up, before plasterboard goes on. After plastering, we return for second fix to fit the accessories, connect the new circuits and test everything. You receive the certificate for building control.
Tell us what you need or what has gone wrong. We aim to respond the same day.
We come out to look at the job, then give you a free quote before any work starts.
We finish the job, test everything and hand you the right certificate for the work.
It depends on the size of the extension, what it's used for and whether your consumer unit needs upgrading. A kitchen extension needs more circuits than a sitting room. We price from your drawings and a site visit, and you get a free quote.
As soon as your builder has a start date. We need to fit first fix once the frame and roof are up, before plasterboard goes on. Booking early means we can plan the visits around the build and avoid any delays.
Yes. Loft conversions need lighting, sockets and usually mains-powered, linked smoke alarms along the escape route down through the house. We plan the cable routes from the floor below, connect to your consumer unit and provide the certificate that building control will ask to see.
Building control inspects the structure, but for the electrics they rely on the certificate from a registered electrician. Because we're NAPIT approved, we notify them of the work directly once it has been tested. They then include it when they issue your completion certificate.
We wire extensions and loft conversions in Southport and the surrounding towns. Choose yours.

JoeCo-director and lead electrician
Send us your plans or your builder's start date, and we'll quote for the electrics and book in first fix.